About the Project:
Kearsarge was awarded the rights to develop, finance, construct and own this project through a competitive RFP issued by the City of Manchester. At construction completion this project was New Hampshire’s largest net metering project, a 3.3MW DC ballasted ground-mount array located on the City’s municipal capped landfill. The City serves as the sole offtaker of the project, which was commissioned in December 2021. Kearsarge received permission to operate in December 2021.
Size: 3.3 MW DC
Approximate Annual Production: 4,292,483 kWh
Annual Carbon Dioxide Offset: 3,179 tons
Number of Average Homes’ Electricity Use Annually: 601